High-density short pile turf for functional training zones. Engineered for sled friction, heavy foot traffic, and repeated lateral loading.
Commercial Indoor Gym Turf
Engineered gym turf for functional training zones
Purpose-built indoor gym turf made from premium, high-density short pile fibres. Non-directional design withstands sled friction, heavy foot traffic, and intense daily use without curling, bending, or flattening.
Creates dedicated functional training zones, adds colour to gym layouts, and provides a surface distinct from rubber tile areas. UV-stable, antibacterial, and designed for indoor professional training environments.
Available in five colours and three lengths. Plain design with no markings. For pre-marked tracks with lane lines, speed ladders, and distance markers, see Superstrata Runway.
| Product | Superstrata Tundra |
| Format | Roll, 2m wide |
| Lengths | 10m · 15m · 20m |
| Material | High-density tufted polyethylene, non-directional fibres |
| Backing | Extra-strong latex |
| UV stability | 6,000+ hours |
| Properties | Antibacterial, UV-stable, non-slip |
| Installation | Glue-down or double-sided tape |
| Colours | Green · Blue · Black · Red · Grey |
| Markings | None (plain turf). For markings see Runway. |
| Warranty | 2 years |
| Lead time | 10–14 working days |
Get the full specification pack for Superstrata Tundra.
Enter your email to receive the specification pack:
Specification packs include full technical data sheets, sample boards, and zone planning guidance.
Superstrata products are designed around the actual loads, impacts, and traffic patterns of commercial fitness environments — not pedestrian corridors.
Titan is rated for repeated barbell drops up to 250kg. The compound formulation absorbs and disperses impact energy without surface crumbling or edge lifting.
Every product is backed by a 10-year warranty against manufacturing defects. No mandatory installer requirement — any competent contractor qualifies.
Colour, density, and dimensional tolerances held to the same standard across every production run. Multi-site rollouts and phased installations match.
Standard orders dispatched within 48 hours from UK stock. Larger project volumes available direct from European manufacturing with agreed lead times.